Posted in Other Projects on Jul 10th, 2008
Today I ate half of a bagel that landed cream cheese side down in construction-site dirt. I still had 3 more hours of walking up and down a 30-foot hill in my future and hadn’t eaten breakfast… and yes, I did debate for about 20 seconds about whether or not I would rather have that everpresent gritty [...]
Read Full Post »
Posted in Other Projects on Jun 26th, 2008
I spent the better part of my waking hours today breathing the soup fresh-air of Summer and slogging around through this…
… in a cracked work boot that allowed mud and small bits of grit to seep up around my toes.
Which didn’t even faze me, because first, we are making some serious progress on that big-ass wall.
And more [...]
Read Full Post »
Posted in Other Projects, The Fam on Jun 18th, 2008
It has been a long time since I have stepped in the shower at the end of the day and watched the water flowing to the drain turn black. And not resulting from a skin condition either… this is from what I like to call a really hard days work.
For the next couple of weeks, [...]
Read Full Post »