Month 14 was officially the BIG month in the DIY House Addition Saga. It was the  “I’m moving out of the garage and into a house” month. The “hey look, it takes more than ten steps to get from one side of this room to the other” month. The “sweet baby jesus, I can take a bath” month. In short, it’s been pretty amazing. Also? An exhausting amount of work, but that’s nothing new.

Here are all of the big changes.

Month 14 Progress: Interior Spaces & Goodbye Garage

It started with one. finished. bathroom. Getting it to that state meant grouting the tile, finishing the Pottery Barn inspired vanity and having the sink and toilet installed.

full_bath_final_01

After that things kind of snowballed. The cabinets magically appeared in the kitchen one weekend except for that one in the corner.

DSC_0267

Then it was several days of shoveling debris cleaning up the rest of the living spaces so that there would be an actual place to sit in the house.

DSC_0259

Also, one other little addition (which is one of my favorite things in the house) that I’ve neglected to show you is the fireplace grill. This was a bit of a splurge but worth every penny.

DSC_0300

The closet was also finished up

DSC_1005

Which led to the bedroom floor, and even more excitingly, the appearance of a bed.

DSC_0390

And I have to tell you it’s a bit of a struggle not to just stay laying in that bed in that big mostly-finished room all day. But since the plan is to eventually have a second finished bathroom, I spent a lot of time banging my head against the wall while putting in this floor.

DSC_0451

Biggest pain in the ass project to date, but since it looks good I won’t spend too much time complaining about it.

There was also some progress on the exterior of the house, with the mountains of dirt in the backyard finally being leveled out and seeded, and even a little progress on the siding.

DSC_0474

What can I say? I’ve been busy.

Month 14 Injury Report: I Need To Stop Using This Finger

It would be too much to expect all of that work to go off without a hitch, but I also think the universe may have some kind of vendetta against this finger…

IMG_0861

Which was alternately sliced open by a tile and then invaded by a splinter the approximate length and width of a toothpick.

DSC_0417

However, it is still attached to my body, so my father’s dire predictions about the future state of my digits have yet to come true.

Month 14 DIYed and Didn’t: In My Element

I really like the heavy duty phase of construction particularly since I’ve learned so many new things as this house was being built, but there’s also something to be said for doing something your 100% confident in and just being able to rock out.

In the last two months I:

  • Painted the bathroom and kitchen ceilings
  • Built and finished a bathroom vanity (including tile top)
  • Assembled a corner cabinet
  • Coped and installed baseboard in the bedroom and closet
  • Installed tile membrane and and WarmWire floor heating system
  • Installed the bathroom floor tile
  • Sanded and polyed the bedroom floor

The next month is going to be more of the same, but after that you never know… I may just sit back and drink umbrella drinks for the rest of the summer. Or, you know, maybe finish the siding on the house. Either one.

 

 

2 Responses

  1. It is looking fabulous! You are such an inspiration…and all I’m doing is cleaning out my garage, my bunk house, my well house. But if you can do all this and still work a full-time job, I should be able to clean out and organize three semi-small spaces, right? You give me hope.

Comments are closed.

I'm not interested in a mediocre life. I'm here to kick ass or die.

(formerly DIYdiva.net)