Building a house takes many things– tools, patience, several cases of beer, and most importantly, a plan. In the last couple of years I’ve worked with a number of tradesmen and contractors, and even though I only threatened to bury one of them in the backyard once, I still recommend that anyone undertaking a project like this has an understanding of what it really means to build a house from the ground up, just in case…

Since I’m just finishing up (and moving out of) the first house I was intimately involved in building from the ground up, it seemed like an appropriate time to put together a high-level overview of the different stages of the building process. It’s not a compressive step-by-step plan, but for anyone trying to wrap their head around some of the basics of the building process, this is a great place to start.

Before You Build

It’s easy to think the building process starts with things like foundations and walls — hey, I get as excited as anyone about digging a bigass hole in the ground– but the truth is that almost as much work goes into the “pre-building” stages as actually nailing things together. Here are the things to know about it.

  • Know the zoning of the land, topography, and the location of the corners of the property to determine setbacks and buildable areas.
  • For country folk, make sure you’re clear for a well and septic, while city dwellers will need to make sure they have access to public utilities.
  • If there’s an existing house on the property, make sure you know where the current utilities are located– trust me, the sound of a punctured gas line is something nobody ever wants to hear.
  • Once the house plans are done, the exterior walls need to be staked to prepare for excavation.

DSC_0899
More information on building plans and getting permits (you’ll definitely need one of those) can be found here.

Excavation

The actual “building” portion of the project starts with the foundation, and all foundations will require some excavation. This means heavy equipment, big piles of dirt, and one very awesome hole in the ground.  This should probably only be attempted by professionals using an excavator or backhoe.
future_bedroom

Footings

The footings are the foundation of the foundation. They are the lowest part of the structure and carry the entire load of the house.

  • Footings are always located below the frost line, approximately 4′ deep.
  • Most common problems relating to footings & foundations are caused by poor soil conditions or disturbed soil. (If soil is disturbed, always remove and fill with additional concrete.)
  • In areas that get plenty of rainfall–hello Southern Michigan–footings should have drain tile installed to remove water from around the foundation.

DSC_1233

Foundation

The foundation sits on top of the footings and carries the support for the actual building structure. This is where everything can go right or wrong as far as your entire house being level and plumb.

  • Common types of foundations include full basements, crawl spaces, and slabs.
  • Foundations are most commonly constructed out of poured walls or concrete block.
  • Any part of a foundation that is below-grade should be sealed with a waterproofing agent.
  • All foundations should include anchor bolts that will tie the framing structure into the foundation.
  • After the foundation is finished, cured, and waterproofed, the area around it should be backfilled.

DSC_1254

For more detailed information on footings and foundations see this post.

Floor Framing & Sheathing

Personally, when I think of “framing” I think of putting up walls, but the truth is, after the foundation is done,  the first thing that is framed is the floor. It closes off the foundation and creates a nice level workspace for framing the walls.

  • The floor is made up of a number of 2x dimensional lumber, 16″ on-center.
  • Girders are metal I-beams, or 3 pieces of 2x face nailed together that rest on the foundation walls, and usually have beams supporting the middle.
  • Floor joists typically rest on the sill plate and one end and girder beam at other.
  • There are many rules and code restrictions relating to notching and hole-drilling to accommodate utilities (electrical, plumbing, HVAC).
  • The rim joists are attached the floor joists by end nailing and the floor joists are secured to the sill plate by toenaling with 3 nails.
  • Floor sheathing or “subfloor” is attached to the floor joist system and is a base for all floor materials.
  • Floor sheathing is usually plywood or OSB (5/8″ or 3/4″ thick).
  • Floor sheathing is laid so the maximum number of joists come in contact with the sheet and no two rows next to each other are laid in the same pattern. A 1/8″ gap is left between sheets for expansion.

decking2

Wall Framing & Sheathing

I like to think of the “frame” of the wall as the thing thing that holds up drywall (or sheathing, if you’re on the outside). Getting the wall framing right means you have to consider how the materials that will finish it will be fastened to it, and that the weight of the structure is supported vertically– which means that the weight of the roof is transferred through the walls to the beams in the foundation, and that openings for doors and windows are properly supported.

  • Framing is typically done 2×4 or 2×6 dimensional lumber, spaced 16” OC
  • This is started after the floor sheathing is done, which provides a perfectly flat surface for laying out wall units.
  • Wall units are assembled on the ground and then raised into place and secured with temporary braces. Sheathing may or may not be on the walls at this point.
  • Wall sheathing adds structural integrity to the house and is commonly 1/2″ OSB or plywood.
  • Like floor sheathing, there should be a 1/8″ gab between pieces and the seams should be staggered.

DSC_1381
For more specific information on floor and wall framing, check out this post.

Roof Framing & Sheathing

For a person who runs screaming from math like yours truly, creating the roof structure is the most complicated part of framing. Luckily someone invented prefabbed trusses, but there are still things like slope and drainage to consider, along with the possibility of falling from an unfortunate height.

  • Roof framing consists 2x lumber that supports the sheathing and shingles.
  • The roof can be built 2 ways, either the rafter/ceiling joist system is “built in place” or a prefabricated truss system is built to spec off-site and then put in place with a crane
  • Common roof styles include: Gable, hit, mansard, gambrel, saltbox, and shed.
  • The roof should be “engineered” by a certified structural engineer.
  • Notches or holes should never be cut in the boards of a roof system.
  • Like exterior wall sheathing, roof sheathing is most commonly OSB or plywood , but the minimum thickness will be determined by the truss or rafter spacing.
  • Like floor sheathing, there should be a 1/8″ gab between pieces and the seams should be staggered.

DSC_1387

Envelope Installation

After the exterior wall sheathing is in place, a vapor barrier or “house wrap” is installed which prevents moisture from reaching the wood structure (but allows any moisture that does find its way in to leave).

  • The first sheet of house wrap is started on the bottom (and run horizontally). Each row overlaps the previous by 3″.
  • Once the house wrap has been secured the seams are taped.

DSC_0262

Electrical Rough

Now that most of the elements can be kept at bay by the sheathing on the roof and walls, it’s time to play with exciting things like electricity. The electrical system of a home should be installed entirely by a licensed electrical contractor – and this is a good idea, particularly if you don’t want to electrocute yourself. However, in most states homeowners are allowed to perform electrical work on their own homes

  • Rough electric consists of all electric work and materials from the meter to the outlet/switch boxes without receptacles or fixtures installed
  • Some good-to-know electrical facts:
    • A minimum of two 20-amp circuits are required in the kitchen area
    • All receptacles within 6 inches of a water source should be protected by a GCFI receptacle
    • All bathrooms must have one 20-amp branch circuit
    • In all habitable rooms (bedrooms, kitchen, living rooms, etc. not closets or bathrooms) walls without openings must have a receptacle within 12 feet of each other

DSC_0752

Plumbing Rough

The plumbing system is tasked with the very important job of bringing good “potable” water into the house and taking bad “waste” water out. This is another one that should be done by a licensed plumber or that a homeower can do themselves, but there’s no one to point the finger at then, when a toilet overflows. (Hint: If you’re doing it yourself, make sure the drain lines are properly vented to ensure the fixtures actually drain.)

DSC_0337

Mechanical Rough

“Mechanical” generally refers to the HVAC system that circulates air throughout the house. It includes a furnace, air conditioner, vents, duct work, etc. It may also include any necessary gas piping.

  • Proper placement of vents is important to even heating and cooling of the house.
  • There is a maximum distance vents (like the clothes dryer vent) can travel.

DSC_1004

Window/Exterior  Door Installation

Unless you’re doing most of the work yourself– ahem– it’s likely that things like window and door installation will be going on simultaneously with the rough utilities. If you want to use a fancy word for it, door and window systems are referred to as the fenestration of a home, but not ever by me.

  • All exterior doors must be a minimum of 1-3/4″ thick and should have a passage lockset as well as a deadbolt lockset with a minimum 1″ throw.

DSC_0261

Roofing Installation

The roof is by far the most important part of keeping the weather outside of the structure, and carrying water safely away from the walls and foundation. Roofing systems may be metal sheets or shingles made from asphalt, wood, slate, or fiberglass.

  • Roofing systems include drip edge (a metal strip that runs the perimeter of the roof), tar paper underlayment, possible ice guard, and shingles.
  • Roof pitch is measured by a number over 12, for example “4:12″, which the slope of the roof is 4 feet vertical for every 12 feet horizontal.
  • For a roof with a pitch of 4:12 or greater, one layer of underlayment can be used. For a roof with a pitch between 2:12 and 4:12, two layers of underlayment are necessary.
  • For shingle roofs, all fasteners must be galvanized with a broad flat head, and long enough to extend all the way through the shingle and the roof sheathing.

DSC_0632

Siding

The number of choices you have on materials to use on your house increases exponentially when talking about siding. Brick, wood, stone, vinyl, and fiber-cement are just a few siding options. Personally I prefer wood that has to be hand nailed with impossible to find stainless steel fasteners, but that’s just me.

  • Full brick or stone siding must be supported by a brick-ledge in the foundation. Veneer brick or stone does not.
  • Wood or vinyl siding must be attached in a way that allows it to expand and contract as the temperature changes.

DSC_0754

Interior Insulation

Interior insulation can be done any time after the doors and windows are installed, the roof is complete, and the utilities are roughed in.

  • The amount of insulation needed in the exterior structure is determined by the energy codes. Effectiveness of insulation is measured by “R-value”.
  • Insulation on the interior of the structure is used for soundproofing.
  • Insulation types include fiberglass batts (faced and unfaced), foam board, spray foam, loose cellulose or fiberglass fill.

DSC_1039

Drywall

While drywall might just seem like something to be painted pretty colors and hang pictures on, it also provides insulation and fire resistance.

  • “Drywall” is composed of gypsum board panels, tape for the seams, and joint compound to cover seams and texture the walls.
  • Generally 1/2″ drywall is used on walls. In some states (like my very own Michigan) you need to use 3/4″ drywall on the wall between the house and an attached garage for fire rating. 5/8″ boards are also recommended, but not required, for ceilings.
  • Wallboard is attached to studs first using coarse threaded screws or nails, starting with the ceiling and working down the wall. Drywall seams are staggered similar to exterior sheathing.
  • After wallboard is in place seams are taped and finished with joint compound. When seams are dry the wall may be textured with joint compound using rollers or drywall knifes.

DSC_1114

Get more detailed information and step-by-step directions on drywalling here.

Painting

This the exciting part of house building that means four days out of five you’ll go into your day job with paint freckles on your face. Or maybe that’s just me. Other than the intense decision-making that comes with choosing paint colors, here are some other things to consider:

  • Wall paints generally come in latex or oil based. You can use a latex paint over an oil based primer. Typically oil based paints have a higher VOC level and are more difficult to clean, but are very durable and have great coverage.
  • All drywall should be finished with a primer before painting, unless you’re using a paint and primer in one.
  • Use a flat ceiling paint on the ceiling, a semi-gloss for any trim, and an eggshell for other walls. (Trust me, shiny paint is not in.)
  • If you can manage it, it’s easiest to paint before trim, cabinets, and flooring are installed.

DSC_0322

Interior Doors & Carpentry

Once the paint is one the walls it’s time to start finishing things out with interior doors, and other interior carpentry such as handrails and built-in shelving.

  • Interior doors typically come pre-hung in a frame and are 1-3/8″ thick and 80″ high. There are many style options from slab to mission to six-panel design.
  • Doors widths are usually designated by foot-inches, so a 3-0 door is three feet or 36″ wide.

DSC_0107

Cabinetry

Cabinets can be ordered to fit, or custom built in place for kitchens, bathrooms and other storage areas.

  • Blocking for cabinets can be installed during wall framing to make the cabinet installation easier.
  • Measuring for cabinets should be done after drywall is in place to ensure cabinet sizes are correct.
  • Standard kitchen base cabinets are always 24″ wide and 35″ in height (to accommodate for at least a 1″ thick by 25″ deep counter, bringing the height of the workspace up to 36″.)
  • Standard wall cabinets are 12″ deep, but vary in height.
  • Bathroom base cabinets may only be 29″ high.

DSC_0267
For more information on blocking for cabinets, check out this post, and for building a bathroom vanity from scratch, check out this one.

Flooring

Sheet flooring such as wood, ceramic or vinyl may be installed at this stage, while carpeting is generally installed later. Most floors require some kind of underlayment between the subfloor and finished flooring.

  • Wood flooring generally requires an underlayment rosin paper or roofing tar paper.
  • Laminate may require a special underlayment to pad the floor and prevent squeaking.
  • Vinyl flooring can be installed directly on a smooth plywood subfloor.
  • Tile floor should be installed over at least 1/4″ durock or other cement board underlayment.

DSC_0912
For more information on wood floor installation check out this post, or tile installation try this one.

Utilities Finish

In order for all of those fun pipes and wires hidden in your walls to do their job, the electrical, plumbing, and mechanical work needs to be finalized.

  • Electrical receptacles, switches, and light fixtures will be installed.
  • Plumbing sinks, faucets, toilets, and other fixtures will be installed. (Tubs are generally installed during the rough framing stage of construction.)
  • Vent grills and thermostats for the HVAC system are installed.

DSC_0662
Carpeting

If you’re having carpeting installed it should be the absolute last thing that goes into your house. Unless you want to be vacuuming up construction dust for the rest of eternity, that is.

  • Tack strips are installed around the perimeter of the room.
  • Padding is used underneath carpet, and then carpeting is rolled out, stretched and attached to tack strips. The rough edge is tucked under the baseboard.

Inspections

After the final utilities are in place, inspections are performed on the structure, electrical, mechanical, and plumbing systems in order to obtain a certificate of occupancy.

Certificate of Occupancy

You win. Go get your stuff and move into that damn house already. Or if you’re me… sell it and start building a new one.

DSC_1325

DIY diva

    Comments

  • Katy @ Turtle House


    …oh, that’s all?

    ;-)

    • Kit


      Seriously Katy, the last line of the post was (Did that really take the last two years of my life?) Then I thought that might be depressing for everyone else… lol.

      • Nicole @ Post Grad


        hahaha I love it. Ya know – a few more houses and you could probably write a book. :-P

  • Jessica J


    What a wonderful post! Thank you for compiling all of this information into a relatively succinct and easy to understand construction timeline. Good luck with your next project, in life and construction.

  • Guerrina


    Great article,Kit! I was able to identify many of the items to things I did with Habitat and part of me wants to go visit the site manager to see if we did all of those things since I was only onsite on the weekends. I do know I wish we’d used screws with the sheet rock instead of nails since a few are popping out. Time to slam, patch & paint?

    We did a couple things to gain the “Energy Star Efficient” rating on the houses. One was some type of foam board on the outside in addition to the Tyvek (don’t remember under or over)and these two combined have really helped with heating oil usage. I’ve still got just under 3/4 tank and my last fill was last May. We dropped into the 30s for a few nights here in CT and inside WITHOUT the heat turned on, the temp only dropped to 64!And the other was inside, where the spaces between the sheathing were “a bit” more than 1/8″, we caulked. I looked much like a mummy when I was done with that! Just thoughts for your next home!

  • Guerrina


    Oh, and the seams on the foam board were taped as well as the Tyvek seams!

  • Kelly


    You are my hero. That is all.

  • Kenia Perez


    Wow! I’m getting involved with Habitat for Humanity, and this is a ridiculously useful overview of what, I believe, I can expect when I work on some of their ground-up projects!!

    I might have to print it out and share with other H4H newbies.

    Thanks Kit!!

  • Beth


    I hope you do a final house tour before you move! It has been so fascinating seeing the whole building process and how much a person can do on their own. I can’t wait to see what you do next!

  • Chantelle - ThousandSquareFeet


    It is so neat to see this construction timeline laid out so nicely. We are currently building our country dream home using a carpenter as a consultant but doing the majority of the work ourselves (“ourselves” being my husband and I). It is a great solution to wanting to do it ourselves and ensuring all the math is correct (wow, is there a lot of math to figure out everything) and that the process of getting it donw is correct. We are so thankful for our consultant and thrilled to be building ourselves. Stop by for a visit, if you want. We are currently working on the second floor interior walls and hope to finish those up this week.

  • Pat Krewe


    When you are building the garage do you put up the garage door yourself or hire someone? I know as part of a local Phoenix garage door repair company that the garage door springs can be incredibly dangerous.

  • harshad c joshi


    Dear Sir,

    I am looking for prefabricated bunglow at low coast but it must have good strenth and last long life.

    Like plas wall or any other good quality material use for prefabricated bunglo

  • Orange County Water Damage Remediation


    This is an awesome article! Extremely informative. When building a home, it is important that no water damage or mold occurs. That would be a tragic experience in building your dream home! If you do discover mold or water damage, it is extremely important to contact a professional mold remediation company to contain it before it is too late!

  • Stephanie


    This post is so helpful. We’re starting the process of building a house from the ground up and really feel clueless about where to begin.

    Would you be willing to share any of the cost details with me? We’re trying to determine a price per square foot to be able to choose the size of house we want. If it’s $75/sf versus $100/sf, that’s a big difference.

    Beautiful space!

    Thanks!
    Stephanie

    • Kit


      Hey Stephanie. Since we built (and paid) for things piecemeal, it’s really hard to say what the price/sf was. We individually priced out the “must haves” (framing, roof, heat, water, counters) and made sure we could pay for all of those, then figured we could save up for flooring, fixtures, etc. if we needed to. Good luck with your house! It will be an adventure.

  • Britnee


    Building a house definitely takes a lot of work. Keep up the good work!

  • Joe


    I would like to ask the exact height of the blocking for the kitchen cabinetry.
    thanks,
    Joe

    • Tod


      Joe,
      The typical blocking for cabinets vary a little, depending on cabinet height (30″,36″ or 42″)if you are using 30″ tall cabinets the bottom of the cabinet is set at 54″ from the finished floor (high-point)while the top of the cabinet will be at 84″, most cabinets have a 3″ nailing flange on the top and bottom of the cabinet so set your blocking to them, also very important is to find the high point on the floor and set you cabinets to that, don’t just start in the corner and work out from there, you will end up cutting cabinet bases to get them level, if you have a low spot it is easier to build (shim) down to that than to cut down cabinets, also use “cabinet Screws” do not use drywall screws to hold up your cabinets, drywall screws are only for drywall and will sheer off (your cabinets will fall), Good luck and have fun, its not hard, just time consuming, don’t forget to level and fasten the front of the cabinets together also

  • Brian Marsh


    Awesome post, thanks for sharing!

  • Building Certification Brisbane


    Thanks a lot for what you did here my friend. Hope I could discover more of your post.

  • oz silver


    Awesome blog! Is your theme custom made or did you download it from
    somewhere? A theme like yours with a few simple tweeks would really make my blog stand out.

    Please let me know where you got your theme. Thank you

  • freeze fat away


    Aw, this was an incredibly nice post. Taking the time and actual
    effort to create a great article… but what can
    I say… I hesitate a lot and never seem to get anything done.

  • laminate Wood flooring Cheap


    Hello There. I found your weblog the use of msn. That is an extremely welll written article.
    I will make sure to bookmark it andd return
    to read extra of your helpful info. Thank you for the post.
    I’ll definitely return.

  • Al Kilbury


    Great post! Very detailed. I am going to share this with my home remodeling customers in Rochester, NY.

  • Sam


    Hi, wanting to DIY add on our house too. If you don’t mind me asking, how much did your addition cost total? Thanks

  • Wakil


    very detailed and very well explained :)

    I’m thinking of starting a project of my own but i have no background in constructions or such that’s why i’m busy doing research while i prepare my budget…

    Thanks for the article :)

  • mold removal Houston


    Unfortunately, this is often ignored or minimized by non-professionals.
    Even putting wet dishes in your kitchen cupboards
    will increase the moisture content that molds, mildews, and
    bacteria like to grow. As a result, many loops in the landscape
    are formed and eventually these loops cut off the river, forming lake-type bodies of water adjacent to the main river.

  • sc forensic engineer


    During that trial, the actual testimony with former Secret Company agent Paul Kellerman, who familiar with work for the
    particular Company-controlled Leader, exonerates Lincoln as well as Sara.
    ) Along with this it should be noted that unheated roof rakes will tend to carry more snow than adjacent (heated)
    main roof surfaces. But not just on any given day; it is the amount of snow (weight) that might be expected to occur on the ground, say, once in fifty years.

  • gutter hanging


    Hi to every one, for the reason that I am truly keen of reading this weblog’s post to be updated daily.
    It includes fastidious data.

  • edu.xunta.es


    When I originally commented I clicked the “Notify me when new comments are added” checkbox
    and now each time a comment is added I get three emails with
    the same comment. Is there any way you can remove me from that service?
    Appreciate it!

  • different austin garage


    Spot on with this write-up, I actually believe this website needs a lot more attention. I’ll
    probably be returning to read through more, thanks for
    the info!

  • home building guide pdf


    Thanks for your personal marvelous posting! I certainly enjoyed reading it, you happen to be a
    great author.I will make sure to bookmark your blog and may come back
    from now on. I want to encourage you to definitely continue
    your great writing, have a nice day!

  • Trackbacks

  • Trackback from Readying Your Old Home for Sale in Hayward | Home For Sale In San Jose
    Thursday, 17 November, 2011

    [...] stringent building codes – or have new owners that will want to fix these to meet those codes.Should you be selling your home in Hayward, you have to do numerous things to be certain it is all s…0×223.jpg" alt="" width="252" height="187" />Should you be selling your home in Hayward, you have to [...]

  • Trackback from Things I’m Grateful For: No More Rubble | North Shore Homes
    Tuesday, 24 December, 2013

    […] pile from the side yard has been the largest single project I’ve ever attempted. (Short of pretty much building a house, of course, but that was really 150 smaller projects all aimed at the singular goal of no longer […]

Leave a Comment

Your email is never shared.
Required fields are marked *